+关注
Orhana
暂无个人介绍
IP属地:未知
1
关注
0
粉丝
0
主题
0
勋章
主贴
热门
Orhana
2021-12-23
👍
Tesla, authorities submit documents for German plant approval
去老虎APP查看更多动态
{"i18n":{"language":"zh_CN"},"userPageInfo":{"id":"4088080898942990","uuid":"4088080898942990","gmtCreate":1624979830858,"gmtModify":1624979830858,"name":"Orhana","pinyin":"orhana","introduction":"","introductionEn":"","signature":"","avatar":"https://static.laohu8.com/default-avatar.jpg","hat":null,"hatId":null,"hatName":null,"vip":1,"status":2,"fanSize":0,"headSize":1,"tweetSize":1,"questionSize":0,"limitLevel":999,"accountStatus":4,"level":{"id":0,"name":"","nameTw":"","represent":"","factor":"","iconColor":"","bgColor":""},"themeCounts":0,"badgeCounts":0,"badges":[],"moderator":false,"superModerator":false,"manageSymbols":null,"badgeLevel":null,"boolIsFan":false,"boolIsHead":false,"favoriteSize":1,"symbols":null,"coverImage":null,"realNameVerified":null,"userBadges":[{"badgeId":"35ec162348d5460f88c959321e554969-1","templateUuid":"35ec162348d5460f88c959321e554969","name":"精英交易员","description":"证券或期货账户累计交易次数达到30次","bigImgUrl":"https://static.tigerbbs.com/ab0f87127c854ce3191a752d57b46edc","smallImgUrl":"https://static.tigerbbs.com/c9835ce48b8c8743566d344ac7a7ba8c","grayImgUrl":"https://static.tigerbbs.com/76754b53ce7a90019f132c1d2fbc698f","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2024.05.10","exceedPercentage":"60.58%","individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1100},{"badgeId":"e50ce593bb40487ebfb542ca54f6a561-1","templateUuid":"e50ce593bb40487ebfb542ca54f6a561","name":"出道虎友","description":"加入老虎社区500天","bigImgUrl":"https://static.tigerbbs.com/0e4d0ca1da0456dc7894c946d44bf9ab","smallImgUrl":"https://static.tigerbbs.com/0f2f65e8ce4cfaae8db2bea9b127f58b","grayImgUrl":"https://static.tigerbbs.com/c5948a31b6edf154422335b265235809","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2022.11.24","exceedPercentage":null,"individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1001},{"badgeId":"976c19eed35f4cd78f17501c2e99ef37-1","templateUuid":"976c19eed35f4cd78f17501c2e99ef37","name":"博闻投资者","description":"累计交易超过10只正股","bigImgUrl":"https://static.tigerbbs.com/e74cc24115c4fbae6154ec1b1041bf47","smallImgUrl":"https://static.tigerbbs.com/d48265cbfd97c57f9048db29f22227b0","grayImgUrl":"https://static.tigerbbs.com/76c6d6898b073c77e1c537ebe9ac1c57","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2022.06.07","exceedPercentage":null,"individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1102},{"badgeId":"518b5610c3e8410da5cfad115e4b0f5a-1","templateUuid":"518b5610c3e8410da5cfad115e4b0f5a","name":"实盘交易者","description":"完成一笔实盘交易","bigImgUrl":"https://static.tigerbbs.com/2e08a1cc2087a1de93402c2c290fa65b","smallImgUrl":"https://static.tigerbbs.com/4504a6397ce1137932d56e5f4ce27166","grayImgUrl":"https://static.tigerbbs.com/4b22c79415b4cd6e3d8ebc4a0fa32604","redirectLinkEnabled":0,"redirectLink":null,"hasAllocated":1,"isWearing":0,"stamp":null,"stampPosition":0,"hasStamp":0,"allocationCount":1,"allocatedDate":"2022.01.30","exceedPercentage":null,"individualDisplayEnabled":0,"backgroundColor":null,"fontColor":null,"individualDisplaySort":0,"categoryType":1100}],"userBadgeCount":4,"currentWearingBadge":null,"individualDisplayBadges":null,"crmLevel":3,"crmLevelSwitch":0,"location":"未知","starInvestorFollowerNum":0,"starInvestorFlag":false,"starInvestorOrderShareNum":0,"subscribeStarInvestorNum":0,"ror":null,"winRationPercentage":null,"showRor":false,"investmentPhilosophy":null,"starInvestorSubscribeFlag":false},"baikeInfo":{},"tab":"hot","tweets":[{"id":691430023,"gmtCreate":1640226047154,"gmtModify":1640226047154,"author":{"id":"4088080898942990","authorId":"4088080898942990","name":"Orhana","avatar":"https://static.laohu8.com/default-avatar.jpg","crmLevel":3,"crmLevelSwitch":0,"followedFlag":false,"idStr":"4088080898942990","authorIdStr":"4088080898942990"},"themes":[],"htmlText":"👍","listText":"👍","text":"👍","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://laohu8.com/post/691430023","repostId":"2193192720","repostType":4,"repost":{"id":"2193192720","kind":"highlight","weMediaInfo":{"introduction":"Reuters.com brings you the latest news from around the world, covering breaking news in markets, business, politics, entertainment and technology","home_visible":1,"media_name":"Reuters","id":"1036604489","head_image":"https://static.tigerbbs.com/443ce19704621c837795676028cec868"},"pubTimestamp":1640185119,"share":"https://www.laohu8.com/m/news/2193192720?lang=&edition=full","pubTime":"2021-12-22 22:58","market":"us","language":"en","title":"Tesla, authorities submit documents for German plant approval","url":"https://stock-news.laohu8.com/highlight/detail?id=2193192720","media":"Reuters","summary":"BERLIN, Dec 22 - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.The approval process is still ongoing, the ministry said.Tesla could not be immediately reached for comment.Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Die","content":"<p>BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.</p>\n<p>The approval process is still ongoing, the ministry said.</p>\n<p>Tesla could not be immediately reached for comment.</p>\n<p>Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.</p>\n<p>Tesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.</p>\n<p>Since Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.</p>\n<p>The response to all objections raised in that consultation is a prerequisite for a final building permit.</p>\n<p>Currently, Tesla is only working on the factory on the basis of preliminary building permits.</p>","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Tesla, authorities submit documents for German plant approval</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nTesla, authorities submit documents for German plant approval\n</h2>\n\n<h4 class=\"meta\">\n\n\n<a class=\"head\" href=\"https://laohu8.com/wemedia/1036604489\">\n\n\n<div class=\"h-thumb\" style=\"background-image:url(https://static.tigerbbs.com/443ce19704621c837795676028cec868);background-size:cover;\"></div>\n\n<div class=\"h-content\">\n<p class=\"h-name\">Reuters </p>\n<p class=\"h-time\">2021-12-22 22:58</p>\n</div>\n\n</a>\n\n\n</h4>\n\n</header>\n<article>\n<p>BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.</p>\n<p>The approval process is still ongoing, the ministry said.</p>\n<p>Tesla could not be immediately reached for comment.</p>\n<p>Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.</p>\n<p>Tesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.</p>\n<p>Since Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.</p>\n<p>The response to all objections raised in that consultation is a prerequisite for a final building permit.</p>\n<p>Currently, Tesla is only working on the factory on the basis of preliminary building permits.</p>\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{"BK4533":"AQR资本管理(全球第二大对冲基金)","BK4555":"新能源车","BK4550":"红杉资本持仓","BK4099":"汽车制造商","BK4551":"寇图资本持仓","BK4548":"巴美列捷福持仓","TSLA":"特斯拉","BK4527":"明星科技股","BK4534":"瑞士信贷持仓"},"is_english":true,"share_image_url":"https://static.laohu8.com/e9f99090a1c2ed51c021029395664489","article_id":"2193192720","content_text":"BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.\nThe approval process is still ongoing, the ministry said.\nTesla could not be immediately reached for comment.\nDue to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.\nTesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.\nSince Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.\nThe response to all objections raised in that consultation is a prerequisite for a final building permit.\nCurrently, Tesla is only working on the factory on the basis of preliminary building permits.","news_type":1},"isVote":1,"tweetType":1,"viewCount":551,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"CN","totalScore":0}],"hots":[{"id":691430023,"gmtCreate":1640226047154,"gmtModify":1640226047154,"author":{"id":"4088080898942990","authorId":"4088080898942990","name":"Orhana","avatar":"https://static.laohu8.com/default-avatar.jpg","crmLevel":3,"crmLevelSwitch":0,"followedFlag":false,"idStr":"4088080898942990","authorIdStr":"4088080898942990"},"themes":[],"htmlText":"👍","listText":"👍","text":"👍","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"link":"https://laohu8.com/post/691430023","repostId":"2193192720","repostType":4,"repost":{"id":"2193192720","kind":"highlight","weMediaInfo":{"introduction":"Reuters.com brings you the latest news from around the world, covering breaking news in markets, business, politics, entertainment and technology","home_visible":1,"media_name":"Reuters","id":"1036604489","head_image":"https://static.tigerbbs.com/443ce19704621c837795676028cec868"},"pubTimestamp":1640185119,"share":"https://www.laohu8.com/m/news/2193192720?lang=&edition=full","pubTime":"2021-12-22 22:58","market":"us","language":"en","title":"Tesla, authorities submit documents for German plant approval","url":"https://stock-news.laohu8.com/highlight/detail?id=2193192720","media":"Reuters","summary":"BERLIN, Dec 22 - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.The approval process is still ongoing, the ministry said.Tesla could not be immediately reached for comment.Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Die","content":"<p>BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.</p>\n<p>The approval process is still ongoing, the ministry said.</p>\n<p>Tesla could not be immediately reached for comment.</p>\n<p>Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.</p>\n<p>Tesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.</p>\n<p>Since Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.</p>\n<p>The response to all objections raised in that consultation is a prerequisite for a final building permit.</p>\n<p>Currently, Tesla is only working on the factory on the basis of preliminary building permits.</p>","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Tesla, authorities submit documents for German plant approval</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nTesla, authorities submit documents for German plant approval\n</h2>\n\n<h4 class=\"meta\">\n\n\n<a class=\"head\" href=\"https://laohu8.com/wemedia/1036604489\">\n\n\n<div class=\"h-thumb\" style=\"background-image:url(https://static.tigerbbs.com/443ce19704621c837795676028cec868);background-size:cover;\"></div>\n\n<div class=\"h-content\">\n<p class=\"h-name\">Reuters </p>\n<p class=\"h-time\">2021-12-22 22:58</p>\n</div>\n\n</a>\n\n\n</h4>\n\n</header>\n<article>\n<p>BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.</p>\n<p>The approval process is still ongoing, the ministry said.</p>\n<p>Tesla could not be immediately reached for comment.</p>\n<p>Due to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.</p>\n<p>Tesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.</p>\n<p>Since Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.</p>\n<p>The response to all objections raised in that consultation is a prerequisite for a final building permit.</p>\n<p>Currently, Tesla is only working on the factory on the basis of preliminary building permits.</p>\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{"BK4533":"AQR资本管理(全球第二大对冲基金)","BK4555":"新能源车","BK4550":"红杉资本持仓","BK4099":"汽车制造商","BK4551":"寇图资本持仓","BK4548":"巴美列捷福持仓","TSLA":"特斯拉","BK4527":"明星科技股","BK4534":"瑞士信贷持仓"},"is_english":true,"share_image_url":"https://static.laohu8.com/e9f99090a1c2ed51c021029395664489","article_id":"2193192720","content_text":"BERLIN, Dec 22 (Reuters) - Tesla and relevant authorities have submitted all the documents necessary for the approval process for its planned factory near Berlin, the environment ministry of the German state of Brandenburg said on Wednesday.\nThe approval process is still ongoing, the ministry said.\nTesla could not be immediately reached for comment.\nDue to environmental resistance and red tape, it remained unclear when the first vehicles will roll off the production line at the site. Brandenburg premier Dietmar Woidke had recently suggested a decision might come in early 2022.\nTesla has repeatedly had to push back the expected opening of the factory and Chief Executive Elon Musk has regularly travelled to Germany to check on the plant's progress, criticising German bureaucracy for slowing down construction.\nSince Tesla expanded its original proposal to include a battery factory, the construction plans had to undergo a renewed process of public consultation which ended on Nov. 22.\nThe response to all objections raised in that consultation is a prerequisite for a final building permit.\nCurrently, Tesla is only working on the factory on the basis of preliminary building permits.","news_type":1},"isVote":1,"tweetType":1,"viewCount":551,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"CN","totalScore":0}],"lives":[]}