RMAR
2021-05-13
Ok
Nine contracts worth S$320m awarded for Singapore-Johor RTS Link systems
免责声明:上述内容仅代表发帖人个人观点,不构成本平台的任何投资建议。
分享至
微信
复制链接
精彩评论
我们需要你的真知灼见来填补这片空白
打开APP,发表看法
APP内打开
发表看法
{"i18n":{"language":"zh_CN"},"detailType":1,"isChannel":false,"data":{"magic":2,"id":191788325,"tweetId":"191788325","gmtCreate":1620907963567,"gmtModify":1634195397620,"author":{"id":3583990679573923,"idStr":"3583990679573923","authorId":3583990679573923,"authorIdStr":"3583990679573923","name":"RMAR","avatar":"https://static.laohu8.com/default-avatar.jpg","vip":1,"userType":1,"introduction":"","boolIsFan":false,"boolIsHead":false,"crmLevel":2,"crmLevelSwitch":0,"individualDisplayBadges":[],"fanSize":0,"starInvestorFlag":false},"themes":[],"images":[],"coverImages":[],"extraTitle":"","html":"<html><head></head><body><p>Ok</p></body></html>","htmlText":"<html><head></head><body><p>Ok</p></body></html>","text":"Ok","highlighted":1,"essential":1,"paper":1,"likeSize":0,"commentSize":0,"repostSize":0,"favoriteSize":0,"link":"https://laohu8.com/post/191788325","repostId":1102970767,"repostType":4,"repost":{"id":"1102970767","kind":"news","pubTimestamp":1620907015,"share":"https://www.laohu8.com/m/news/1102970767?lang=&edition=full","pubTime":"2021-05-13 19:56","market":"sg","language":"en","title":"Nine contracts worth S$320m awarded for Singapore-Johor RTS Link systems","url":"https://stock-news.laohu8.com/highlight/detail?id=1102970767","media":"The Straits Times","summary":"[SINGAPORE] Nine contracts worth about S$321.7 million have been awarded for system works for the Jo","content":"<div>\n<p>[SINGAPORE] Nine contracts worth about S$321.7 million have been awarded for system works for the Johor Baru-Singapore Rapid Transit System (RTS) Link, said the rail link's operator - RTS Operations (...</p>\n\n<a href=\"https://www.businesstimes.com.sg/transport/nine-contracts-worth-s320m-awarded-for-singapore-johor-rts-link-systems\">Web Link</a>\n\n</div>\n","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>Nine contracts worth S$320m awarded for Singapore-Johor RTS Link systems</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 11px; color: #7E829C; margin: 0;line-height: 11px;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nNine contracts worth S$320m awarded for Singapore-Johor RTS Link systems\n</h2>\n\n<h4 class=\"meta\">\n\n\n2021-05-13 19:56 GMT+8 <a href=https://www.businesstimes.com.sg/transport/nine-contracts-worth-s320m-awarded-for-singapore-johor-rts-link-systems><strong>The Straits Times</strong></a>\n\n\n</h4>\n\n</header>\n<article>\n<div>\n<p>[SINGAPORE] Nine contracts worth about S$321.7 million have been awarded for system works for the Johor Baru-Singapore Rapid Transit System (RTS) Link, said the rail link's operator - RTS Operations (...</p>\n\n<a href=\"https://www.businesstimes.com.sg/transport/nine-contracts-worth-s320m-awarded-for-singapore-johor-rts-link-systems\">Web Link</a>\n\n</div>\n\n\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"","relate_stocks":{},"source_url":"https://www.businesstimes.com.sg/transport/nine-contracts-worth-s320m-awarded-for-singapore-johor-rts-link-systems","is_english":true,"share_image_url":"https://static.laohu8.com/e9f99090a1c2ed51c021029395664489","article_id":"1102970767","content_text":"[SINGAPORE] Nine contracts worth about S$321.7 million have been awarded for system works for the Johor Baru-Singapore Rapid Transit System (RTS) Link, said the rail link's operator - RTS Operations (RTSO).\nIn an update on Wednesday (May 12), the operator, a joint venture between Singapore rail operator SMRT and Malaysia's public transport firm Prasarana, said these system works are \"progressing well\".\nIt did not specify when these contracts were awarded.\nFour of the contracts were for core systems, with Chinese firm CRRC Zhuzhou Locomotive taking charge of the rail link's rolling stock and the Malaysian subsidiary of Siemens Mobility handling the signalling system and platform screen doors.\nAnother Malaysian firm, Sapura Rail Systems, was awarded contracts to set up the communications system and the integrated supervisory control system.\nThe remaining five contracts are for track work, power supply systems, depot equipment and service vehicles, as well as an automatic fare collection system.\nThe firm said it had earlier awarded a systems consultancy contract for the design, manufacturing, delivery, testing and commissioning of all systems for the RTS Link, which will connect Woodlands North with Bukit Chagar in Johor Baru.\nRTSO chief executive, Mr Shamsul Rizal Md Yusof, said: \"We are pleased with the outcome of the tender exercise. There is a good mix of local and international players working together to make the RTS Link a success.\" RTSO chairman, Datuk Mohd Farid Mohd Adnan, said the firm is fully committed to delivering the RTS project despite the challenges posed by the Covid-19 pandemic. Vice-chairman Yap Kim Wah said the good progress made on the project is a testament to the close collaboration among all parties.\nRTSO was formed last year and will own, design, build, finance and manage all RTS Link operating assets, including trains, tracks and systems.\nThe Singapore-incorporated company will also operate and maintain the 4km rail line and the associated Wadi Hana depot in Johor Baru.\nThe latest update comes several months after Singapore broke ground on the Woodlands North terminus station in January, and the Land Transport Authority awarded a S$180 million contract to build a 25m-tall viaduct and rail tunnels for the RTS Link.\nConstruction on the viaduct, which will span the Johor Strait, and the tunnels were expected to begin this quarter. Construction on the Bukit Chagar terminus station had begun last November.\nWhen completed in end-2026, the RTS Link is expected go some way towards easing congestion on the Causeway. Before Covid-19 restrictions were imposed, close to 300,000 people crossed the Causeway daily.\nThe rail link is expected to carry up to 10,000 passengers every hour in each direction, and the trip between both terminus stations should take only five minutes.\nCommuters departing from Woodlands North will be served by a terminus station and an immigration complex about 10 times the size of a typical MRT station.\nAnnounced in 2010, the bilateral project was suspended in 2019 at the request of Malaysia which wanted to review its scope, structure and costs. It officially resumed in July last year.","news_type":1},"isVote":1,"tweetType":1,"viewCount":154,"commentLimit":10,"likeStatus":false,"favoriteStatus":false,"reportStatus":false,"symbols":[],"verified":2,"subType":0,"readableState":1,"langContent":"EN","currentLanguage":"EN","warmUpFlag":false,"orderFlag":false,"shareable":true,"causeOfNotShareable":"","featuresForAnalytics":[],"commentAndTweetFlag":false,"andRepostAutoSelectedFlag":false,"upFlag":false,"length":2,"xxTargetLangEnum":"ORIG"},"commentList":[],"isCommentEnd":true,"isTiger":false,"isWeiXinMini":false,"url":"/m/post/191788325"}
精彩评论